accepted 2026-10-08 2026-10-20 shared maintainer decision of 2026-10-08; closing choices of 2026-10-19; status of 2026-10-20

Decision 21: A quality gate before 5.0.0

  • Choice: 5.0.0 ships only at the highest quality, with everything tested (maintainer, 2026-10-08). The gate has three phases:
    1. Measure 5.0.0-rc5: done on 2026-10-08 (progress.md).
    2. Add tests until every code path is tested or explained, live tests for the remaining cmdlets, and test-first fixes of the known defects; release them as 5.0.0-rc6. The maintainer approved it on 2026-10-08.
    3. Run the live tests on more operating systems, such as a Windows 11 client and Server 2019 and 2022 file servers, then release 5.0.0.
  • Exit criteria for 5.0.0, as proposed on 2026-10-08:
    • Every cmdlet and parameter set has behavior tests, error paths included.
    • No test is skipped in every configuration that runs.
    • The C# coverage is measured, and every path that no test runs is tested or explained.
    • Every known defect is fixed, or accepted by the maintainer and listed in the release notes.
    • The published package passes the live tests on every operating system of the matrix.
  • Rationale: rc5 passed every test that ran, but the tests ran 55.9% of the code lines and 37.4% of the branches; five cmdlets had no tests of their own, and 19 cmdlets never ran over SMB. (That measurement counted only one of the four test runs; with all four, rc5 runs 58.1% of the lines and 38.0% of the branches, see techContext.md.)
  • Open: behavior changes found on the way stay the maintainer's decision (Decision 16); so do the 244 lines of classes that no cmdlet calls, the operating systems of Phase 3, and how to cover file servers that aren't Windows (#34).

Closing the gate (maintainer, 2026-10-19)

After Handoff 5 and the merges of #125 and #124 (master at 354ce04), the maintainer answered five questions, each time with the recommended option:

  • rc8 is the next prerelease and carries master, which is ahead of rc7 by the seven product files of #125. Stable 5.0.0 is accepted through the last prerelease (Docs/Contributing/05-Releasing.md), so rc8 is mandatory.
  • Code before rc8: fix the false "no access" of Get-NTFSEffectiveAccess (the swallowed initialization errors, a LOW finding of the security review), test-first, with an independent review. The hard-link names under a root that is not the volume root stay a known limit that the release notes list (the exit criterion allows "fixed, or accepted and listed"). The other open items of the paths report and of Handoff 5 are not decided yet.
  • Test gaps: the plain test items that the ParameterSets table marks budget (68 mentions in the 57 sets that are not closed) are closed in a round of tests only, time-boxed to 2026-11-02; the report lists what is left. The shipped DLL does not change by it. A defect that a test finds needs its own decision and a new prerelease.
  • #34: wait for a tester until 2026-11-02, then choose between waiting longer and accepting the untested risk (Decision 23, option 3).
  • Decisions 22 and 24 are accepted (their records).
  • A tester's result on rc7 counts for rc8 only while no change of rc8 touches the code that writes a section of a security descriptor (Decision 19). The seven product files of #125 have no such line, and the fix of Get-NTFSEffectiveAccess reads.
  • Path to stable: the rc8 pull request (label rc8, 5.0.0-rc7 into $publishedVersions, changelog), the tag, the acceptance of the published rc8 (matrix cells, first lab, suite on the four machines), the stable pull request (no Prerelease, ## [5.0.0] - <date>, 5.0.0-rc8 into $publishedVersions), the tag. The maintainer checks the expiry of PSGALLERY_API_KEY before the stable tag. After 5.0.0 the repository is archived (Decision 18), so what ships stays.

Status on 2026-10-20

rc8 is published (tag c719197, Gallery 10:40:58Z) and accepted: the identity check, three matrix cells 1,374/0/12, the suite in 24 runs, the first lab 245/0/1 per edition, every end state CLEAN (record Tests/Lab/Acceptance-2026-10-20-published-rc8.md). The fix of the swallowed initialization errors went in with a review (one Minor, the warning before the error, fixed), and the hard-link known limit is in the pages and the CHANGELOG. The exit criterion "matrix on published bytes" is met for rc8; open are the tests-only round (until 2026-11-02), #34 (2026-11-02), and the key check. The stable build is new bytes: the stable change may touch only the label, the CHANGELOG, and $publishedVersions; any other product change needs rc9 and the same acceptance.